Tradesman's bill higher than the cost estimate in Germany: do I have to pay the extra amount?

A non-binding cost estimate (Kostenvoranschlag) is not a price guarantee, but the tradesman must report a foreseeable substantial overrun immediately (§ 649 of the German Civil Code, BGB). You may then terminate and pay only for the work done so far. A fixed price, by contrast, is binding.

Whether you have to pay a higher tradesman's bill depends on what was agreed. A fixed price, or a cost estimate (Kostenvoranschlag) for whose accuracy the tradesman has assumed a guarantee, binds him – as a rule he bears the additional costs, as long as you have not ordered anything extra. An ordinary, non-binding cost estimate, by contrast, is only an expert estimate. It may be exceeded, but not at will and not silently: if a substantial overrun is to be expected, the tradesman must notify you of this without undue delay (§ 649 para. 2 of the German Civil Code, Bürgerliches Gesetzbuch, BGB). You then have the right to terminate the contract and to pay only for the work performed up to that point (§ 649 para. 1 BGB).

Cost estimate, offer or fixed price?

Non-binding cost estimate. The tradesman estimates the expected costs without assuming a guarantee. The actual remuneration is based on the actual work and expense. In case of doubt, a cost estimate is not to be paid for (§ 632 para. 3 BGB). If the tradesman wants money for preparing the estimate, this must be agreed beforehand.

Binding cost estimate or fixed price. If the tradesman has “assumed the guarantee for the accuracy of the estimate” or agreed a lump-sum or fixed price, that price applies. Additional costs that arise from his own misjudgment are at his expense. It is different only if you demand changes or additional services; for this, § 650b BGB provides that the parties are to seek agreement on the change and on the increase or reduction in remuneration.

Without a price agreement. If the amount of the remuneration is not specified at all, the customary remuneration is deemed to be agreed (§ 632 para. 2 BGB).

What “substantial overrun” means

The law does not name a fixed percentage limit. What matters is whether the deviation, in relation to the total sum, is so considerable that a reasonable customer would have reconsidered the matter. Small deviations are in the nature of an estimate and you have to accept them. The greater the difference, the more likely it is to be substantial. In the event of a dispute the court decides according to the circumstances of the individual case.

The tradesman's duty to notify

Under § 649 para. 2 BGB the contractor must notify the customer without undue delay if a substantial overrun of the estimate is to be expected. The purpose: you should be able to decide whether to have the work continued at the higher cost or to stop it.

If the tradesman breaches this duty, he may become liable for damages. Under § 280 para. 1 BGB the creditor can claim compensation for the damage that arises from a breach of duty, unless the debtor is not responsible for it. In practice this means: if you would have terminated had you been warned in time, you can demand to be placed in the position you would be in if you had terminated in time. The tradesman then does not, in the result, automatically receive the full extra amount. What a court awards in the individual case depends, however, on what value the additional work performed has for you.

Your right to terminate and the consequences

If it turns out that the work cannot be carried out without a substantial overrun of the estimate, and you terminate for this reason, the tradesman is only entitled to the claim set out in § 645 para. 1 BGB (§ 649 para. 1 BGB). This is a part of the remuneration corresponding to the work performed and reimbursement of the expenses not included in the remuneration. So you pay for what has already been done, but no lost profit.

This is more favourable than the general free termination under § 648 BGB. Under that provision you can terminate a contract for work (Werkvertrag) at any time until completion, but the tradesman can then demand the agreed remuneration less expenses saved; it is presumed that he is entitled to 5 percent of the remuneration attributable to the part not yet performed. Anyone who terminates because of a cost overrun should therefore state the reason expressly.

Practical example

The R. family is having its bathroom renovated. The tiler gives a non-binding cost estimate of EUR 8,000. After removing the old tiles he finds that the screed is damp and crumbling, and reckons with a total of about EUR 12,500. He calls immediately and sends an e-mail with the new calculation. The R. family can now choose: it has the work continued and pays the higher actual costs, or it terminates with reference to the overrun and pays only for the work performed so far and the expenses. Had the tiler carried on working without notice and demanded EUR 12,500 at the end, the family could have raised objections to the extra amount because of the breach of the duty to notify.

How to proceed

Get cost estimates in writing and clarify whether they are binding. For larger jobs, agree a fixed price if possible and a duty to consult you before additional costs. If a considerably higher bill arrives, demand a comprehensible breakdown of working time and materials and ask in writing when the tradesman recognised the overrun and why he did not report it. Pay the undisputed amount and withhold the disputed part, giving reasons. In the case of large sums, defects in the work or if the tradesman threatens to sue, you should get advice from a lawyer; consumer advice centres (Verbraucherzentralen) offer initial assessments.

Step by step

  1. Check the agreement — Establish whether a non-binding cost estimate, a binding estimate or a fixed price was agreed.
  2. Calculate the deviation — Compare the bill and the cost estimate and check whether the additional costs are based on additional orders.
  3. Request a breakdown — Demand a comprehensible breakdown of working time and materials.
  4. Clarify the notification — Ask in writing when the tradesman recognised the overrun and whether he reported it without undue delay.
  5. Pay what is undisputed, give reasons for what is disputed — Transfer the undisputed part and withhold the rest with written reasons; get advice where the amounts are large.

Documents you need

  • Written cost estimate or offer
  • Order confirmation or contract
  • Correspondence about changes and additional work
  • Final invoice with a breakdown of hours and materials
  • Photos of the progress of the work
  • Your own notes on telephone calls, with dates

Common mistakes to avoid

  • Obtaining only verbal cost estimates.
  • Not clarifying whether the estimate is binding.
  • Ordering additional work verbally and later disputing the additional costs.
  • Terminating because of additional costs without stating this reason.
  • Withholding the whole bill instead of only the disputed part.

Frequently asked questions

Is a cost estimate binding?

Only if the tradesman has assumed the guarantee for its accuracy or a fixed price has been agreed. An ordinary cost estimate is an estimate that may be exceeded.

From what percentage is an overrun substantial?

The BGB does not name a fixed limit. It depends on whether the deviation in the individual case is so large that a reasonable customer would have decided differently.

Do I have to pay for the cost estimate?

In case of doubt, no. Under § 632 para. 3 BGB a cost estimate is not to be paid for, unless remuneration was expressly agreed.

What do I pay if I terminate because of the additional costs?

Under § 649 para. 1 in conjunction with § 645 para. 1 BGB only a part of the remuneration corresponding to the work performed and the expenses, no lost profit.