Home renovation works contract with a consumer — Spain
Having your flat or house in Spain renovated or repaired by a builder and want to understand the contract in English? This free wizard creates a renovation works contract with a consumer (contrato de obra de reforma) under the Spanish Civil Code and the consumer protection law (TRLGDCU). You answer the questions in English and get the contract in Spanish and English, paragraph by paragraph.
The contract covers the parties, the description of the works, materials, licences, a fixed or per-unit price including all taxes, payments and invoices, start and end dates, written changes, acceptance of the works, guarantees and, when signed off the contractor's premises, the 14- or 30-day right of withdrawal. The Spanish text is the legally binding one; the English version helps both parties understand exactly what they sign.
Designed for renovations and repairs that a consumer orders from a company or self-employed tradesperson in an existing home. It is not suitable for building a new house or for a refurbishment that substantially transforms the building (these require a project, professional site supervision and building regulations), nor for works between businesses or works for the owners' association (comunidad de propietarios). Municipal licences, the applicable VAT, complaint forms (hojas de reclamaciones) and other consumer rules depend on the autonomous community and the town council. Consult a lawyer or the consumer office if the works are of high value, there is damage or the company does not comply.
What the contract covers
- SUBJECT MATTER. The contractor undertakes to carry out at the property located at {{inmueble}} the works described below, and the client undertakes to pay the agreed price (Articles 1544 and 1588 of the Spanish Civil Code):
- MATERIALS. {{materiales}} The materials shall be new and of the qualities described, unless the client accepts other equivalent materials in writing.
- LICENCES AND NOTIFICATIONS. {{permisos}}
- PRICE. {{modalidad_precio}} The total price, including all taxes, is {{precio_total}}. No other item shall be charged that does not appear in this contract or in a variation annex signed by the client.
- PAYMENT. {{forma_pago}}
- TIME LIMITS. The works shall start on {{fecha_inicio}} and must be completed by {{fecha_fin}}. The time limits shall only be extended for reasons not attributable to the contractor, for changes requested by the client or by written agreement of both parties. Penalty for delay, if agreed: {{penalizacion_retraso}}.
- CHANGES TO THE WORKS. Any change, additional work or substitution of materials shall be agreed in writing before it is carried out, stating its price and its effect on the time limit, and shall be signed by both parties. Without that written authorisation, the contractor may not claim a price increase for the changes.
- PERFORMANCE AND STAFF. The contractor shall carry out the works in accordance with good trade practice and the applicable regulations, with its own or subcontracted resources and staff. It is liable for the work carried out by the persons it employs on the works (Article 1596 of the Spanish Civil Code) and for any damage it causes to the property, its common elements or third parties during the works. At the end of each working day it shall leave the work area in a safe condition.
- ADDITIONAL CONDITIONS. {{condiciones_adicionales}}
- ACCEPTANCE OF THE WORKS. When the works are finished, the parties shall inspect them together and sign an acceptance record (acta de recepción) noting any defects or outstanding work, which the contractor shall correct within the time limit set in the record. The client may withhold the part of the price corresponding to the outstanding work until it is completed.
- GUARANTEES. The contractor warrants that the works conform to what was contracted. Additional commercial guarantee offered by the contractor, if any: {{garantia_comercial}}. This guarantee does not limit the rights that the law grants the client as a consumer, which cannot be waived (Article 10 TRLGDCU).
- PLACE OF CONTRACTING AND WITHDRAWAL. {{lugar_contratacion}}
- WITHDRAWAL BY THE CLIENT AFTER THE WORKS HAVE STARTED. In addition to the above, the client may withdraw from the works even if they have started, compensating the contractor for its expenses, work and the profit it could have obtained from them (Article 1594 of the Spanish Civil Code).
- TERMINATION FOR BREACH. If one of the parties seriously breaches its obligations, the other may require it in writing to perform within a reasonable time and, if it does not, terminate the contract and claim damages. The works correctly carried out up to that date shall be settled.
- COPY OF THE CONTRACT. The client receives at this act a copy of this signed contract and its annexes.
- LAW AND COURTS. This contract is governed by Spanish law, in particular the Civil Code and the Consolidated Text of the General Law for the Protection of Consumers and Users (TRLGDCU). Disputes shall be submitted to the competent courts in accordance with the law, without prejudice to the client's right to turn to the consumer services or to consumer arbitration.
How it works
- Answer the questions step by step.
- Check everything on the review page.
- Download the contract or send it for e-signing.
Frequently asked questions
Can I cancel a renovation contract signed at home in Spain?
If the contract is signed off the contractor's premises or at a distance, the consumer can withdraw without giving a reason within 14 calendar days, or 30 days if the contractor came on an unsolicited visit (Articles 102 and 104 TRLGDCU). There is no right of withdrawal if you requested the visit for an urgent repair (Article 103.h).
Can a builder in Spain charge more than the agreed fixed price?
With a fixed lump-sum price (ajuste alzado), the contractor cannot ask for more because wages or materials go up, except for changes authorised by the client that increase the works (Article 1593 of the Civil Code). This contract also requires every change to be agreed and signed in writing before it is carried out.
What if I let the works start during the withdrawal period?
You must request it expressly. If you then withdraw, you pay the amount proportionate to the work already carried out, and once the works are fully completed you lose the right of withdrawal (Articles 103.a and 108.4 TRLGDCU).
When do I have to pay for the works?
Unless otherwise agreed, the price is paid on delivery of the works (Article 1599 of the Civil Code). In this contract you set the payment schedule yourself, and the contractor must issue an invoice for each payment.
Is the text I type myself translated?
No. Text you type yourself, such as the description of the works, the payment schedule or other conditions, is copied into both language versions exactly as written. Since the Spanish text is binding, you may prefer to write it in Spanish.
Official sources
- BOE — Real Decreto Legislativo 1/2007, Texto Refundido de la Ley General para la Defensa de los Consumidores y Usuarios (arts. 10, 60, 63, 92, 93, 99 y 102-108)
- BOE — Código Civil (arts. 1091, 1152, 1544 y 1588-1599, contrato de obra)